NMDOT Home Page

NMDOT Road Construction Projects

District Reference Map

District 3 

Kenneth Murphy, P.E.
Construction Assistant District Engineer
kenneth.murphy@state.nm.us
P.O. Box 91750
Albuquerque, NM 87199
Telephone: 505-798-6600
Toll Free: 866-466-8178
Fax: 505-798-6663

Justin Gibson, P.E.
Area Project Manager
JustinL.Gibson@state.nm.us


NM 423 Paseo Del Norte: Milepost 2.792 to Milepost 6.823 for 4.03 miles. Project A300816 

Scope: Pavement preservation on NM 423 Paseo Del Norte mainline to include open grade friction course, guardrail replacement, curb repairs, drop-inlet adjustments and striping throughout project. 

Approximate Cost: $3,519,385.70
Anticipated Start DateSummer  2016
Expected Completion Date: Fall  2016

Project Sponsor:
NMDOT
Jeremy Maestas, Project Manager (505) 259-9567 Jeremy.Maestas@state.nm.us

Contractor: Albuquerque Asphalt Inc.
202 94th St SW City
Albuquerque, NM

(505) 292-9046


I-25 and I-40 Bridge Preservation Project
I-25 Milepost 224.9 to 226.28 and I-40 at milepost 159.7 for 0.573 miles (A300697)
Scope:
The New Mexico Department of Transportation (NMDOT) is performing bridge preservation work on nine bridges on the Interstate system. 
Bridge Locations:
I-40 over University Boulevard
I-40 WB off ramp to I-25 northbound
I-25 NB off ramp to Lomas Boulevard exit 225
I-25 SB/NB over Menaul Boulevard
I-25 SB off-ramp to I-40 Eastbound
I-25 NB off-ramp exit to Lomas Boulevard
I-40 WB off ramp to I-25 NB over Frontage Road

Approximate Cost: $978,978.00
Anticipated Start Date:  Summer 2016
Expected Completion Date: Fall 2016

Project Sponsor:
NMDOT
Jeremy Maestas, Project Manager 505-798-6674 jeremy.maestas@state.nm.us

Contractor:
Truesdell Corporation of Tempe, AZ
1310 W. 23rd Street
Tempe, AZ 85282


NM 6 Roadway Improvements Project West of Los Lunas

Scope: The New Mexico Department of Transportation (NMDOT) is reconstructing the NM 6 roadway corridor from MP 18.531 to MP 23.636. Improvements will include new pavement cross-section in addition to miscellaneous construction within the right-of-way including drainage and driveway improvements.

Approximate Cost: $5.12 million
Anticipated Start Date:  June 2016
Expected Completion Date: Winter 2016

Project Sponsor: 
NMDOT
Patsy Najar, Project Manager (505) 798-6783  Patsy.Najar@state.nm.us

Contractor:

Mountain States Constructors, Inc.
3601 Pan American Freeway NE Suite 111
Albuquerque, NM 87107
(505) 292-0108


I-40 at Unser Boulevard (Milepost 153.74 to 154.35)  A 300076

Scope: Sound wall construction and lighting.

Approximate Cost: $2.54 million
Anticipated Start Date: April 2016
Expected Completion Date: August 2016

Project Sponsor:
NMDOT
Patsy Najar, Project Manager (505) 798-6783 patsy.najar@state.nm.us

Contractor:
AUI, Inc
7420 Reading Avenue SE
Albuquerque, NM 87105
(505) 242-4848


NM 45 Coors Pavement Preservation from Montano to Paseo Del Norte:
Scope: Pavement preservation from Montano to Paseo Del Norte.

Approximate Cost: $2,886,617.12
Anticipated Start Date: Summer 2016
Expected Completion Date: Fall 2016

Project Sponsor:
NMDOT
Emiliano Martinez, Project Manager (505) 798-6699 emiliano.martinez@state.nm.us

Contractor:
Mountain States Constructors, Inc
3601 Pan American Frwy NE # 111
Albuquerque, NM 87119
(505) 292-0108


NM 47 Peralta Roadway Improvements Project

Scope: The New Mexico Department of Transportation and contractor, AUI, Inc. is reconstructing the NM 47 Peralta roadway corridor. Improvements will be from milepost 31-32.8 approximately 1.8 miles in length.  The project will include new pavement cross section, curb and gutter with sidewalks, drainage system and miscellaneous construction within the right-of-way including utilities.

Approximate Cost: $12.1 million
Start Date Aug. 2015
Expected Completion Date: Fall  2016

Project Sponsor:
NMDOT
Chris Sinclair, Project Manager (505) 798-6754 chris.sinclair@state.nm.us

Contractor: AUI, Inc.
7420 Reading Ave. SE
Albuquerque, NM 87105
(505) 242-4848


Documents

I-25 South corridor study

The New Mexico Department of Transportation (NMDOT) in cooperation with the Federal Highway Administration (FHWA) is conducting an engineering study for the South I-25 Corridor from the NM 47/Broadway Interchange to the I-40/I-25 Interchange.

Project Purpose:

The objective of the study is to identify transportation needs in the corridor and to develop a priority plan that will enable the NMDOT to program funds for both near and long term projects.

Public Meetings:

The team offers the public updates on the status of the study and the findings of the detailed analysis at public meetings. The team seeks comments from the public as part of the evaluation of the alternatives prior to deciding on a preferred improvement alternative for the corridor.

If you have questions about the study please contact:

• Bernadette Bell, NMDOT Public Information Officer at (505) 798-6645, bernadette.bell@state.nm.us; or

• Mark Fahey, NMDOT Project Manager at (505) 798-6717 Mark.Fahey@state.nm.us

Or comments and/or questions specific to this study may be sent to:

Attn: South I-25 Corridor Study

WSP | Parsons Brinckerhoff
6100 Uptown Boulevard NE, Suite 700
Albuquerque, NM 87110
Or email your comments to: wagnercs@pbworld.com.

To request Americans with Disabilities Act (ADA) accommodations for public meetings, please contact Cheryl Wagner with Parsons Brinckerhoff at least two days prior. See meeting schedule in ‘documents’ section.