I-40, Bridge Preservation Project
Milepost 160.39 to 167.5, .285 miles (A300696)
Scope: The New Mexico Department of Transportation (NMDOT) is performing bridge preservation work on nine bridges on the Interstate system as well as bridges located over I-40. 
Bridge Locations:
I -40 over Tramway Boulevard
I-40 over Diversion Channels
Carlisle Bridge over I-40 and Embudo Channel
Washington Bridge over I –40
San Pedro Bridge over I-40

Approximate Cost: $1.1 million
Anticipated Start Date:  April 2016
Expected Completion Date: Summer 2016

Project Sponsor:
NMDOT
Jeremy Maestas, Project Manager 505-798-6674 jeremy.maestas@state.nm.us

Contractor:
RAM Construction Services of Michigan
13800 Eckles Rd, Livonia, MI 48150
(734) 464-3800
www.ramservices.com


I-25 and I-40 Bridge Preservation Project
I-25 Milepost 224.9 to 226.28 and I-40 at milepost 159.7 for 0.573 miles (A300697)
Scope:
The New Mexico Department of Transportation (NMDOT) is performing bridge preservation work on nine bridges on the Interstate system. 
Bridge Locations:
I 25 SB off ramp to I -40 EB ramp over University Boulevard
I-40 over University Boulevard
I-40 WB to I-25 Over University Boulevard
I-25 NB off ramp to Lomas Boulevard exit 225
I-25 SB/NB over Menaul Boulevard
I-25 off-ramp over NB and EB Frontage road
I-40 WB off ramp to I-25 NB over Frontage Road

Approximate Cost: $978,978.00
Anticipated Start Date:  October 2016
Expected Completion Date: Fall 2016

Project Sponsor:
NMDOT
Jeremy Maestas, Project Manager 505-798-6674 jeremy.maestas@state.nm.us

Contractor:
Truesdell Corporation of Tempe, AZ
1310 W. 23rd Street
Tempe, AZ 85282


NM 47 Peralta Roadway Improvements Project
Scope: The New Mexico Department of Transportation (NMDOT) is reconstructing the NM 47 Peralta roadway corridor. Improvements will be from milepost 31.0 to 32.8 approximately 1.8 miles in length and will include new pavement cross-section, curb and gutter with sidewalks, and drainage system. Miscellaneous construction within the right-of-way including utilities will also be completed.

Approximate Cost: $12.1 million
Anticipated Start Date:  Aug. 2015
Expected Completion Date: Fall 2016

Project Sponsor:
NMDOT
Chis Sinclair, Project Manager 505-798-6754  chris.sinclair@state.nm.us


I-40 at Unser Boulevard (Milepost 153.74 to 154.35)  A 300076

Scope: Sound wall construction and lighting.

Approximate Cost: $2.54 million
Anticipated Start Date: April 2016
Expected Completion Date: August 2016

Project Sponsor:
NMDOT
Patsy Najar, Project Manager (505) 798-6783 patsy.najar@state.nm.us

Contractor:
AUI, Inc
7420 Reading Avenue SE
Albuquerque, NM 87105
(505) 242-4848


NM 314, Railroad Overpass
Scope: Bridge replacement over BNSF railroad

Approximate Cost: $9.1 million
Anticipated Start Date: April 2015 with suspension from Nov. 2015 to January 2016
Expected Completion Date: Spring 2016

Project Sponsor:
NMDOT
Chris Sinclair, Project Manager 505-798-6754 chris.sinclair@state.nm.us

Contractor:
El Terrero Construction, LLC
4824 Huron Drive
Rio Rancho, NM 87144
(505) 896-3864


I-25, North of Broadway to South of Rio Bravo
Scope: Roadway and Bridge Reconstruction

Approximate Cost: $20.2 million
Anticipated Start Date: Spring 2015
Expected Completion Date: Spring 2016

Project Sponsor:
NMDOT
Emiliano Martinez, Project Manager (505) 798-6699 emiliano.martinez@state.nm.us

Contractor:
Mountain States Constructors, Inc
3601 Pan American Frwy NE # 111
Albuquerque, NM 87119
(505) 292-0108


Public Documents

I-40, Eastbound Louisiana Boulevard Interchange, MP 162.5 to MP 163.5

Scope:
Reconstruction of concrete pavement entrance and exit ramps, pavement reconstruction on Louisiana Boulevard, addition of 3rd  left turn lane for eastbound to northbound traffic at eastbound off-ramp.

Approximate Cost: $3.7 million
Anticipated Start Date: Winter 2016
Expected Completion Date: Spring 2016

Project Sponsor:
NMDOT
Emiliano Martinez, Project Manager (505) 798-6699 emiliano.martinez@state.nm.us

Contractor:
Interstate Highway Construction, Inc
P.O. Box 9172 Albuquerque, NM 87119
Office (505) 212-7007
www.IHCQuality.com