NMDOT Road Construction Projects

District Reference Map

District 3 

Kenneth Murphy, P.E.
Construction Assistant District Engineer

P.O. Box 91750
Albuquerque, NM 87199
Telephone: 505-798-6600
Toll Free: 866-466-8178
Fax: 505-798-6663

Justin Gibson, P.E.
Area Project Manager
justin.gibson@state.nm.us


NM 528 Pat D’Arco Highway Improvement Project
Scope: Reconstruction and improvement of NM 528 (Pat D’Arco Highway) from Southern Boulevard to Northern Boulevard. The project will be done in phases based on the amount of funding that is available. Planned improvements include reconstructing/rehabilitating the existing pavement, widening to three continuous driving lanes in each direction, adding left and right turn lanes at all intersections, adding continuous on-street bike lanes in each direction, frontage road improvements in the Industrial Park area, replacing the multi-use trail and extending it to Northern Boulevard upgrading traffic signal equipment and sidewalk ramps to comply with the Americans with Disabilities Act (ADA), modifying access to improve highway operations and safety, installation of a storm sewer system, and noise mitigation.

Estimated Project Cost:
$12 Million – Phase I, Southern Blvd. to Ridgecrest Dr.  Started in March 2014 and currently on suspension until temperature dependent final surface and striping can be completed.

$16 Million – Phase 2, Ridgecrest Dr. to Northern Blvd.

Project Sponsor:
NMDOT
Rais Rizvi, P.E. – Project Development Engineer 505-798-6710 Rais.rizvi@state.nm.us

Patsy Najar – Construction Project Manager 505-798-6682 patsy.najar@state.nm.us

Consultant:
Parsons Brinkerhoff
Hal Byrd – Project Manager
6100 Uptown Blvd., N.E. Suite 700
Albuquerque, NM 87110
(505)881-5357
byrd@pbworld.com


NM 47 Peralta Roadway Improvements Project
Scope: The New Mexico Department of Transportation (NMDOT) is conducting the NM 47 Peralta Corridor Study to develop and evaluate alternatives for improving NM 47 from milepost (MP) 31.0 at Valencia Road to MP 32.8 located approximately 285 feet north of the Peralta Post Office. The goal of the project is to develop and evaluate alternatives that would correct existing roadway and drainage deficiencies, address roadway congestion, and improve safety conditions.

Project Sponsor:
NMDOT
Chis Sinclair, Project Manager 505-798-6754  chris.sinclair@state.nm.us


I-25, Sunport to Gibson
Scope: Auxiliary lane addition and noise barrier wall construction

Approximate Cost: $2.7 million
Anticipated Start Date:  Spring 2015
Expected Completion Date: Fall 2015

Project Sponsor:
NMDOT
Emiliano Martinez, Project Manager 505-798-6699  emiliano.martinez@state.nm.us

Contractor:
AUI, Inc
P.O. Box 9825
Albuquerque, NM 87119
(505) 242-4848


NM 314, Railroad Overpass
Scope: Bridge replacement over BNSF railroad

Approximate Cost: $9.1 million
Anticipated Start Date: April 2015 with suspension from October 2015 to January 2016
Expected Completion Date: Spring 2016

Project Sponsor:
NMDOT
Chris Sinclair, Project Manager 505-798-6754 chris.sinclair@state.nm.us

Contractor:
El Terrero Construction, LLC
4824 Huron Drive
Rio Rancho, NM 87144
(505) 896-3864


NM 556 (Roy Road) Bridge Replacements over Edith Blvd. and Railroad (NMRX)
Scope: Bridge replacements

Approximate Cost: $5.3 million
Anticipated Start Date: March 2015
Expected Completion Date: Fall 2015

Project Sponsor:
NMDOT
Jeremy Maestas, Project Manager 505-798-6674  jeremy.maestas@state.nm.us

Contractor:
El Terrero Construction, LLC
4824 Huron Drive
Rio Rancho, NM 87144
(505) 896-3864


I-40, West end of Rio Grande River Bridge to just West of Coors Interchange
Scope: Pavement rehabilitation on ramps, pavement reconstruction on I-40

Approximate Cost: $13 million
Anticipated Start Date: Spring 2015
Expected Completion Date: Fall 2015

Project Sponsor:
NMDOT
Patsy Najar, Project Manager 505-798-6682  patsy.najar@state.nm.us


NM 45, Eduardo to Tower
Scope: Pavement preservation

Approximate Cost: $1.3 million
Anticipated Start Date: Spring 2015
Expected Completion Date: Summer 2015

Project Sponsor:
NMDOT
Patsy Najar, Project Manager 505-798-6682  patsy.najar@state.nm.us


I-25, North of Broadway to South of Rio Bravo
Scope: Roadway and Bridge Reconstruction

Approximate Cost: $20.2 million
Anticipated Start Date: Spring 2015
Expected Completion Date: Winter 2015

Project Sponsor:
NMDOT
Emiliano Martinez, Project Manager 505-798-6699 emiliano.martinez@state.nm.us

Contractor:
Mountain States Constructors, Inc
3601 Pan American Frwy NE # 111
Albuquerque, NM 87119
(505) 292-0108